Showing 1772 results

archival descriptions
With digital objects
Print preview View:
July 5th 1916: Walking dredge, Camp 1, Mile 16
July 5th 1916: Walking dredge, Camp 1, Mile 16
July 5 1916: Bending steel for Inverts Camp 3, Mile 25
July 5 1916: Bending steel for Inverts Camp 3, Mile 25
Division 3A - Camp 6 - Class #14 Drag Line
Division 3A - Camp 6 - Class #14 Drag Line
Mile 97.5 - Party at Indian Bay
Mile 97.5 - Party at Indian Bay
Contract 31 Soil Test Sec. "E" 6" x 6" Load 1000#
Contract 31 Soil Test Sec. "E" 6" x 6" Load 1000#
Contract 32 - Mile 59 - Concrete aqueduct with packed backfill in place. Ready for machine placed backfill.
Contract 32 - Mile 59 - Concrete aqueduct with packed backfill in place. Ready for machine placed backfill.
Contract 15 - Falcon River Diversion Dyke - Riprapping west side of dyke
Contract 15 - Falcon River Diversion Dyke - Riprapping west side of dyke
Contract 33 - Mile 77 - East End of Siphon
Contract 33 - Mile 77 - East End of Siphon
Contract 32 - Mile 58 - Pumping water from trench, looking southeast
Contract 32 - Mile 58 - Pumping water from trench, looking southeast
Contract 34 - Mile 89 Putting in Box Drains
Contract 34 - Mile 89 Putting in Box Drains
Results 31 to 40 of 1772